TGA Consulting Engineers LLP  have a long track record in Survey / Investigation / Report type commissions. 

Examples of the former include the pre-acquisition / dilapidations surveys carried out on behalf of Railtrack of the majority of the railway stations in the UK, including mainline stations in London and other major cities. For this commission we were able to mobilise ten teams of engineers, from our Durham and Stevenage offices, who dealt with stations in various regions of the UK over a relatively short period of time. 

examples of longer term commissions include those which we currently hold with both William Hill and with Ladbrokes whereby we visit a proportion of their respective outlets each year. We have also worked with a number of major Clients to establish and run planned preventative maintenance contracts on both single large sites and multiple sites. 

These have included major headquarters buildings for Pearl Assurance and Royal London Insurance, the estate of the British Library in London and Yorkshire and estates throughout the UK for Halifax plc, Northern Rock and William Hill Organisation. Degi: TGA Consulting Engineers LLP were commissioned, as part of a multi-disciplinary team to carry out a series of pre-acquisition surveys on ten major office buildings in central London. The surveys were carried out in a week by mobilising five separate TGA survey teams, each comprised of a senior electrical and a senior mechanical engineer.    

Hotels: TGA Consulting Engineers LLP were commissioned to carry pre-acquisition surveys and reports, including assessment of refurbishment costs / necessary upgrading works for a portfolio of four luxury hotels. These include: Hotel George V, Paris, Hotel Bristol, Warsaw, Hotel Ritz, Madrid, Hotel Les Bergues, Geneva 

 

London Surveys : TGA Consulting Engineers LLP were commissioned, as part of a multi-disciplinary team to carry out a series of pre-acquisition surveys over a period of time in central London. Buildings surveyed include: 140-142 Bishopsgate, 33 Gracechurch St, 36 Gracechurch St, 5 Lothbury, Cheapside House, City Place, Staple Hall, Stone House, 

Railtrack: TGA Consulting Engineers LLP were commissioned to carry out an intensive programme of condition surveys, prior to the sale of the main line railway stations to Railtrack. We subsequently carried our a number of commissions arising from these surveys. The survey works included the vast majority of mainline and branch stations in the UK including those in London and required that we mobilise a large number of survey teams for an extended period of time. All survey team members were required to undertake and pass Railtrack PTS (Personal Track Safety) training. Stations surveyed include: London Kings Cross, London Euston, London Liverpool Street, London Victoria, London Paddington, London Waterloo, London Gatwick, Birmingham Lime Street, Manchester Piccadilly,York, Newcastle, Edinburgh, As part of our ongoing involvement at the British Museum since the early 1990s 

TGA Consulting Engineers LLP  have been commissioned to carry out a number of surveys leading to the preparation of reports. These include: Site survey and feasibility study with costed options for renewal of Mechanical and Electrical Services Site wide survey of existing emergency lighting installations Survey of White Wing Heating Installation Survey and report into implications of re-opening the British Museum following a power failure. 

TGA Consulting Engineers LLP  were commissioned as part of a multi-disciplinary survey team to carry out a pre-acquisition survey of the complete shopping centre including all retail units, malls, plant spaces, multi-storey car parks and multi-storey residential properties constructed above the centre. The survey was carried out by three separate TGA teams, each comprising of a senior mechanical and a senior electrical engineer, working in parallel over a week.